EVER BLUE POOLSPOOL REBAR INSTALLATION
Elevated view of a backyard pool excavation with wooden forms, ready for steel

Steel set in 1–2 days after excavation.

Ever Blue Pools installs pool rebar for builders across North Texas — tied to your engineered plan and ready for inspection, so your schedule never waits on steel.

Illustrative render
  1. DAY 0Excavation ready
  2. DAY 1Steel tied to the engineered plan
  3. DAY 2Inspection-ready, your crew shoots

Pools stall when the rebar crew is late. Bad steel turns into rework and extra cost.

So we do one job: pool rebar. Our crew mobilizes the moment excavation is done, coordinates directly with your excavator, and leaves the steel checked and ready for inspection.

  • Mobilize right after excavation — no downtime on site
  • Steel aligned with plumbing, drains and lighting
  • If something isn't right, we come back and correct it

The job log behind the claim.

We don't ask you to take our word for it. Every job is logged from excavation-ready to steel-complete.

46 pools for one North Texas builder in the last 12 months.

25+ years tying pool steel.

CityExcavation readySteel startSteel completeRebar days
Gatesville, TX05/03/2605/05/2605/05/261
Waco, TX05/15/2605/16/2605/16/261
Lorena, TX05/18/2605/19/2605/19/261
Waco, TX05/29/2606/01/2606/01/261
McGregor, TX06/22/2606/23/2606/23/261

Reviewed jobs for a North Texas pool builder, May–June 2026.

Rebar grid along the floor and walls of a pool excavation, with white plumbing passing through the steel

Built to the engineered plan. Ready for inspection.

  1. 1Foundation and wallsFull rebar installation following the approved engineered pool plan.
  2. 2Aligned with every lineSteel built around plumbing, drainage and lighting details.
  3. 3Made for hydrostatic pressureDurable structural framing designed to hold the concrete shell.
  4. 4Checked before we leaveWork is checked before delivery, so your inspection goes clean.

From plan to steel in four steps.

  1. 01Send us the planUpload the approved engineered plan or text a photo of it.
  2. 02We review and scope itSteel takeoff, features and site access, confirmed with you.
  3. 03You get an estimateA clear price for the job.
  4. 04We schedule and set steelOn site as soon as excavation is ready. Steel done in 1–2 days.
For the fastest start, we need:
  • Excavation ready
  • Approved pool plan
  • Clear access to the job site
  • Changes approved before work begins

Same yard. One day later.

Drag the handle on any job to compare excavation-ready with steel-complete.

Steel tied to the engineered planElevated view of a backyard pool excavation with wooden forms, ready for steelDAY 0 · EXCAVATION READYDAY 1 · STEEL COMPLETE
Illustrative
Rebar laid across a large rectangular pool excavation at a construction site

Every pool your clients love starts with steel.

Put us on your next dig
Finished backyard pool with a raised spa at dusk, underwater lights on
The finished pool, for contextOur part is the rebar. Concrete, finishes and decking are completed by other trades.Illustrative render

Where we've set steel lately

  • Waco
  • Woodway
  • Lorena
  • McGregor
  • Robinson
  • Gatesville
  • Temple
  • Eddy
  • Meridian

Serving pool builders across North Texas. Outside these towns? Send the address.

Checked before delivery. If something isn't right, we come back and fix it.Insured crew — certificate of insurance available on request.

Send us the plan. We'll take it from there.

Builders, superintendents and project managers: share the job and we'll come back with scope and an estimate.

Call or text · English & Español972-922-2300info@everbluepoolstx.com
Pool features
Drop the plan here — it speeds up your estimate.
Preferred language
We reply by phone or email. Your plan is only used to prepare the estimate.